Reebok @ DryDock in Boston, MA – Part 1

When Reebok moved their headquarters to the DryDock area of Boston and needed their lighting project done ON TIME and WITHIN BUDGET, they turned to ESC. With an aggressive five-month timeline, ESC had to have impeccable project management and coordination with Reebok, the general contractor (Gilbane Building Company), electrical contractor, lighting designer (Lam Partners), and rep agents Boston Light Source and Apex Lighting Solutions and controls, supporting multiple manufacturers.

As you’d expect, a project of this nature comes with its challenges. The 220,000 square foot building is five floors, each floor having a different lighting schedule. ESC worked closely with Reebok and all involved to develop a strategy to meet the timeline and control systems requirements. This project only had a partial design when the five-month move-in timeline was requested. By working with the lighting manufacturer directly, ESC was able to ensure the lighting system had the backbone, capacity to fit out each floor and integrate with each subsystem even though the design wasn’t complete.

How was ESC able to accomplish this? Check out our post tomorrow and we’ll tell you! 

To learn more about ESC or contact us, go to www.escctr.net or click here to send an email.

CONTACT:
Natalie Holtgrefe
Marketing Lead
nholtgrefe@escctr.net
781-750-8555